Belton Octal Socket VT8-PT, long leads
Belton Octal Socket VT8-PT, long leads
Preview: Belton Octal Socket VT8-PT, long leads
Preview: Belton Octal Socket VT8-PT, long leads
Belton Octal Socket VT8-PT, long leads
Mobile Preview: Belton Octal Socket VT8-PT, long leads
Mobile Preview: Belton Octal Socket VT8-PT, long leads

Belton Octal Socket VT8-PT, long leads

Product No.:
sk24
<font color=green><b>In stock for immediate delivery.</b></font> </br>Delivery time depends on the destination country* In stock for immediate delivery.
Delivery time depends on the destination country* 
RoHs:
conform
Weight:
0.02 kg per piece
2,45 €

incl. VAT excl. Shipping costs

Customers who bought this product bought also the following products:

F+T 33 µF @ 500 Volt, axial
  • Type: Aluminum Electrolytic Capacitors
  • Capacitance: 33 µF
  • Voltage Rating: 500 V
  • Tolerance: +/- 20%
  • Operating Temperature Range: - 40°C / + 85 °C
  • Dimensions: Ø 18 mm x 39 mm
  • Termination Style: axial
3,10 €

F+T 50 + 50 µF / 500 V Multisection
  • Type: Multisection Capacitor
  • Capacitance: 50 + 50 µF
  • Voltage Rating: 500 V
  • Tolerance: - 10% / +30 %
  • Operating Temperature Range: - 40°C / + 85 °C
  • Dimensions: Ø 35 mm x 50 mm
  • Termination Style: radial, solder lugs
8,95 €

Elektrolyt 22 µF @ 35 V
  • Type: Electrolytic capacitor
  • Capacitance: 22 µF
  • Voltage Rating: 35 V
  • Tolerance: - 10 % / +30 %
  • Operating Temperature Range: - 40°C / + 85 °C
  • Dimensions: Ø 5 mm x 11 mm
  • Termination Style: axial
  • Color and manufacturer may differ from the picture shown
0,50 €

JJ Capacitor 30 µF / 500 V axial
Electrolytic Capacitor
  • Capacitance: 30 µF
  • Voltage Rating: 500 V
  • Tolerance: -10 % / +30 %
  • Operating Temperature Range: - 25°C / + 70 °C
  • Dimensions: Ø 25 mm x 42 mm
  • Termination Style: axial leads
6,60 €