Socket Octal, 7/8", long leads
Socket Octal, 7/8", long leads
Socket Octal, 7/8", long leads
Socket Octal, 7/8", long leads
Preview: Socket Octal, 7/8", long leads
Preview: Socket Octal, 7/8", long leads
Preview: Socket Octal, 7/8", long leads
Preview: Socket Octal, 7/8", long leads
Socket Octal, 7/8", long leads
Mobile Preview: Socket Octal, 7/8", long leads
Mobile Preview: Socket Octal, 7/8", long leads
Mobile Preview: Socket Octal, 7/8", long leads
Mobile Preview: Socket Octal, 7/8", long leads

Socket Octal, 7/8", long leads

Product No.:
sk18
<font color=green><b>In stock for immediate delivery.</b></font> </br>Delivery time depends on the destination country* In stock for immediate delivery.
Delivery time depends on the destination country* 
RoHs:
conform
Weight:
0.02 kg per piece
1,95 €

incl. VAT excl. Shipping costs

Needed for:

Psvane 6SN7GT / 6SN7
Psvane 6SN7GT
Drop in replacement for 6N8P 6H8C 6SN7 CV181
24,80 €

Tung-Sol 6SN7 Reissue

Super linearity, low noise, and full performance ratings make this one of the best 6SN7 tubes ever made. The sound signature is on par with 5692 types. Excellent driver tube in high-end audio applications.

46,90 €

Customers who bought this product bought also the following products:

High Power Resistor 150 Ohm / 25 Watt
  • High Power Resistor
  • Power:  25 Watt with heat sink, 12 Watt without heat sink
  • Maximum voltage: 550 V
  • Temperature range: -25°C - +250°C

RoHS Compliant

1,79 €

Rean NYS225B - 6,3 mm (1/4") phone plug, mono
  • Size: 6.3 mm 1/4"
  • Poles: 2-pole, mono
  • Design: straight
  • Connection type: solder connections
2,45 €